Gemini
North Semester 2019B - Dates are local
HST
Engineering
shutdown (labeled grey here) might be delayed and might impact the
schedule.
The
semester calendar shows multi-instrument queue nights, scheduled classical or
Priority Visitor runs, and engineering or commissioning. Dates are local HST,
dates in red are weekends and holidays.
Instruments
potentially usable are indicated by the colored-horizontal bands (see color
key below). Note: Rapid ToO PIs should always
check
the current instrument configuration page
Visiting
instruments schedule : MAROON-X schedule is not confirmed yet at this
time. LGS is available if Altair is
available.
Key:
GMOS
NIRI
NIFS
Visiting
Altair
GMOS and GRACES
GNIRS
Eng./Commis.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
August
GMOS
ENG/SHUTDOWN
(as of 2019aug13)
GNIRS
15 full
NIRI/NIFS
Altair
30 new
Visiting
MRN-X
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
September
GMOS
September
GNIRS
28 new
NIRI/NIFS
13 full
Altair
MAROON-X
TEXES
MAROON-X
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
October
GMOS
October
GNIRS
13 full
NIRI/NIFS
27 new
Altair
Visiting
ALOPEKE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
November
GMOS
November
GNIRS
12 full
NIRI/NIFS
26 new
Altair
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
December
GMOS
December
GNIRS
11 full
NIRI/NIFS
25 new
Altair
Visiting
MAROON-X
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
January
GMOS
January
GNIRS
10 full
NIRI/NIFS
LP-8 PV run
24 new
Altair